System No. HW-D-0118
November 26, 2001
Assembly Rating — 1 and 2 Hr (See Item 2)
Nominal Joint Width — 1 IN.
Class II and III Movement Capabilities — 100% Compression or Extension




1. Floor Assembly
The fire-rated fluted steel deck/concrete floor assembly shall be constructed of the materials and in the manner described in the individual Floor-Ceiling Design in the UL Fire Resistance Directory. The hourly fire rating of the floor assembly shall be equal to or greater than the hourly fire rating of the wall assembly. The floor assembly shall include the following construction features:A. Steel Floor and Form Units*
Max 3 in. deep galv fluted floor units.
B. Concrete
Min 2-1/2 in. thick reinforced (100-150 pcf) concrete, as measured from the top plane of the floor units.
1A. Roof Assembly
As an alternate to Item 1, the fire-rated roof assembly shall be constructed of the materials and in the manner described in the individual P900 Series Roof-Ceiling Designs in the UL Fire Resistance Directory and shall contain max 3 in. deep galv steel fluted roof units. The hourly fire rating of the roof assembly shall be equal to or greater than the hourly fire rating of the wall assembly. In the case of spray-applied protection materials on the steel roof units, the joint system shall be installed prior to the spray-applied protection material.
1B. Floor Assembly
As an alternate to Item 1, min 4-1/2 in. thick reinforced lightweight or normal weight (100-150 pcf) structural concrete.
2. Wall Assembly
The 1 or 2 hr fire-rated gypsum board /steel stud wall assembly shall be constructed of the materials and in the manner described in the individual U400 and V400-Series Wall and Partition Design in the UL Fire Resistance Directory and shall include the following construction features:A. Light Gauge Framing* — Deflection Trak
Deflection trak of wall assembly shall consist of min No. 25 gauge galv steel channels sized to accommodate steel studs (Item 2C) and with offset legs to accommodate wall cladding (Item 3A). Deflection trak installed perpendicular to floor units. Min No. 25 gauge deflection trak secured on both sides to valley of floor units with 1-1/2 in. long welds spaced max 12 in. OC. Min No. 20 gauge deflection trak may be secured with steel fasteners spaced 12 in. OC. FIRE TRAK CORP Shadowline and Cavity Shadowline
B. Studs
Steel studs to be min 2-1/2 in. wide and as specified in the individual Wall and Partition Design in the UL Fire Resistance Directory. Studs cut 1-1/2 in. less in length than the assembly height with bottom nesting in and resting on floor runner and with top nesting in ceiling runner without attachment. Stud spacing not to exceed 24 in. OC.
C. Gypsum Board*
Gypsum board sheets installed and attached to studs and runners as specified in the individual Wall and Partition Design in the UL Fire Resistance Directory, except that a nominal 1 in. gap shall be maintained between top of the gypsum board and the bottom flange of the deflection trak. Top row of screws shall be installed into the studs 3 in. below the top egde of the gypsum board sheets.
D. Bracing
(Not shown) — Bracing as specified in the individual Wall and Partition Design in the UL Fire Resistance Directory. The hourly assembly rating of the joint system is equal to the fire rating of the wall.
Firestop Configuration A and A1
3. Joint System
Max separation between bottom flange of the deflection trak and top of wallboard
(at the time of installation of the joint system) is 1 in. The joint system is designed to accommodate a max 100 percent compression or extension from its installed width. The joint system consists of wall cladding, packing material and a fill material as follows:A. Wall Cladding
Strips of the gypsum wallboard material attached to the deflection trak. The number of layers, board type and thickness and fastener type shall be as specified for the gypsum board in the individual Wall and Partition Design in the UL Fire Resistance Directory. Fasteners shall be max spaced 3 in. OC. The top of the wall cladding shall be flush with the valleys of the steel floor units and overlap the gypsum board 4 in.
B. Flute Fill
The batt insulation and fill material are to be installed as specified in the Joint Systems in the table below:
Manufacturer
Product Designation
System No.
Firestop Systems Inc.
5100SP
HW-D-0025
Hilti Construction Chemicals
CP 672 Fire Spray
HW-D-0042
International Protective Coatings
FS3000
HW-D-0108
Johns Manville International
Firetemp SI, Firetemp SE
HW-D-0047
Minnesota Mining & Mfg.
FireDam™ Spray 100,
HW-D-0020
FireBarrier Spray 100
Nelson Firestop Products
FSC-Firestop Coating
HW-D-0112
Rectorseal
Biostop 700
HW-D-0019
Rectorseal
Biostop 750 Spray, Biostop 750 Caulk Grade
HW-D-0033
Rectorseal
Metacaulk 1100
HW-D-0018
Rectorseal
Metacaulk 1200 Spray, Metacaulk 1200 Caulk Grade
HW-D-0032
Specified Technologies Inc.
SpecSeal AS 200 Spray
HW-D-0054
Tremco
TREMstop Acrylic SP
HW-D-0091
PASSIVE FIRE PROTECTION PARTNERS 5100SP
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC CP 672 Fire Spray
JOHNS MANVILLE INTERNATIONAL INC Firetemp SI, Firetemp SE
MINNESOTA MINING & MFG CO Fire Dam Spray
NELSON FIRESTOP PRODUCTS FSC-Firestop Coating
RECTORSEAL Metacaulk 1100, Metacaulk 1200 Spray, Metacaulk 1200 Caulk Grade, Biostop 700, Biostop 750 Spray, Biostop 750 Caulk Grade
SPECIFIED TECHNOLOGIES INC SpecSeal AS 200 Spray
TREMCO INC TREMstop Acrylic SP
W R GRACE & CO - CONN CONSTRUCTION PRODUCTS DIV FS3000
Firestop Configuration B and B1
3. Joint System-
Max separation between bottom flange of the deflection trak and top of wallboard (at the time of installation of the joint system)
is 1 in. The joint system is designed to accommodate a max 100 percent compression or extension from its installed width. The joint system consists of wall cladding, packing material and a fill material as follows:A. Wall Cladding
Strips of the gypsum board material attached to the deflection trak. The number of layers, board type and thickness and fastener type shall be as specified for the gypsum wallboard in the individual Wall and Partition Design in the UL Fire Resistance Directory. Fasteners shall be max spaced 3 in. OC. The top of the wall cladding shall be flush with the valleys of the steel floor units and overlap the gypsum board 4 in.
B. Flute Fill
The batt insulation and fill material are to be installed as specified in the systems in the table below:
Manufacturer
Product Designation
System No.
DAP Inc.
DAP Firestop Sealant
HW-S-0026
Hilti Construction Chemicals
FS611A
HW-D-0003
Hilti Construction Chemicals
FS-ONE
HW-D-0003
Hilti Construction Chemicals
CP601S
HW-D-0046
Hilti Construction Chemicals
CP606
HW-D-0045
Instant Firestop Mfg.
344-GG
HW-S-0008
Minnesota Mining & Mfg.
FB 1000NS
HW-S-0028
Minnesota Mining & Mfg.
FB 2000
HW-S-0002
Minnesota Mining & Mfg.
FB 2000+
HW-S-0002
Nuco Inc.
Self Seal GG200
HW-S-0011
Rectorseal
Metacaulk 835+
HW-S-0023
Rectorseal
Metacaulk 1000
HW-D-0014
Rectorseal
Biostop 500+
HW-D-0015
Rectorseal
Biotherm 1000
HW-S-0022
Specified Technologies Inc.
SpecSeal ES
HW-D-0034
United States Gypsum Co.
RFC
HW-S-0001
DAP INC DAP Firestop Sealant
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC CP601S, CP606, FS611A or FS-ONE
MINNESOTA MINING & MFG CO FB 1000NS, FB 2000, FB 2000+
NUCO INC Self Seal GG-200
NELSON FIRESTOP PRODUCTS FSC-Firestop Coating
RECTORSEAL Metacaulk 835+, Metacaulk 1000, Biostop 500+ Caulk, Biotherm 100
SPECIFIED TECHNOLOGIES INC SpecSeal ES Sealant
UNITED STATES GYPSUM CO RFC
*Bearing the UL Classification Mark