System No. C-AJ-2128
December 20, 2000
F Rating — 3 Hr
T Rating — 1/2 Hr
L Rating At Ambient — 28 CFM/sq ft
L Rating At 400 F — Less Than 1 CFM/sq ft

1. Floor or Wall Assembly
Min 4-1/2 in. thick reinforced lightweight or normal weight (100-150 pcf) concrete. Wall may also be constructed of any UL Classified Concrete Blocks*. Max diam of opening is 4 in.See Concrete Blocks (CAZT) category in the Fire Resistance Directory for names of manufacturers.
2. Nonmetallic Pipe
One nonmetallic pipe to be centered within the firestop system. A nom annular space of 7/8 in. is required within the firestop system. Pipe to be rigidly supported on both sides of floor or wall assembly. The following types and sizes of nonmetallic pipes may be used: A. Polyvinyl Chloride (PVC) Pipe
Nom 2 in. diam (or smaller) Schedule 40 PVC pipe for use in closed (process or supply) or vented (drain, waste or vent) piping systems.
B. Chlorinated Polyvinyl Chloride (CPVC) Pipe
Nom 2 in. diam (or smaller) SDR 17 CPVC pipe for use in closed (process or supply) or vented (drain, waste or vent) piping systems.
3. Firestop System
The firestop system shall consist of the following:A. Packing Material
(Optional) — Foam backer rod firmly packed into opening as a permanent form. Packing material to be recessed from top surface of floor or from both surfaces of wall as required to accommodate the required thickness of fill material.
B. Fill, Void or Cavity Material* —
Sealant
Min 2 in. thickness of fill material applied within the annulus, flush with top surface of floor or with both surfaces of wall. RECTORSEAL BioStop 500+ Caulk
*Bearing the UL Classification Mark